Juniors & Exploration
Rocks and Stocks News · Nov 2, 2026, 5:56 AM PST
Here is my interview with Aaron Stone, VP Exploration at Amex Gold Mining. Be aware that Amex Gold Mining paid a fee for video production, but I think the project speaks for itself. Amex has developments going on two fronts: drilling, and the underground workings to get to the Champagne Zone for a 40,000 tonne bulk sample of roughly half-an-ounce-per-tonne rock. I’ve followed Amex since the initial discovery holes, so it’s exciting for me to see Perron going underground to expose the Champagne Zone to first take a bulk sample and prepare for Phase 1 mining. Something in their October 29 news release caught my attention: Aaron’s video of visible gold in the core that produced 227.46 g/t gold over 0.5 metres in the Denise Zone, one of the first holes from their resource conversion drill program at Perron. Aaron says they’re almost 200 metres into the ramp, with about 800 metres of ramp, and about 1.2 to 1.3 kilometres of development in total, to reach the Champagne Zone, and they hope to be face to face with the veins around Q3 next year. That ramp is 5 metres by 5.3 metres, a full mine-size ramp built for the first phase of the operation, the 1,100 tonne-per-day Phase 1 in the feasi
Open on YouTube